Timeline of Events: January 1941 to July 1941
January
January 1, 1941: Lend-Lease Act is passed, as is Undeclared War.
January 2, 1941: USS Savannah, CL, completed and deployed to Norfolk, VA. Construction begins on: two parallel rocket test sites, three parallel radar sites, two AA guns, naval bases, and coastal forts for Wake and Guam, two new infrastructure belts across Arizona and Nevada (2 infra in 12 provinces), 10 IC (parallel) and two strategic bombers (parallel.)
January 3, 1941: Italy embargoes us.
January 5, 1941: ART Carriage and Sights 6 finished; begin Armored Car Gun 1.
January 7, 1941: TAC completed, deployed to Rumford, ME.
January 19, 1941: Coup attempts on Italy and Japan. Both fail.
January 22, 1941: Medium Air Search Radar 1 finished; begin Small Fuel Tank 2.
February
February 1, 1941: Large Air Search Radar 1 and Special Forces 2 finished; begin Single Engine Airframe 2 and AA Barrel and Ammo 1. A whole bunch of RADAR stations get finished; they're placed on Wake and Guam.
February 3, 1941: Another TAC completed and deployed to Rumford, ME. More radar stations done; Guam has lvl 10 radar, Wake is close.
February 6, 1941: CV AAA 5 finished; begin Naval Underway Replenishment 3.
February 8, 1941: Jungle Warfare Equipment finished; begin AA Carriage and Sights 1.
February 9, 1941: Assault Concentration 4 finished; AT Ammo and Muzzle Velocity 1 begins.
February 10, 1941: Basing 2 finished; Small Warship ASW 2 begins.
February 11, 1941: Mountain Warfare Equipment finished; begin AT Barrel and Sights 1.
February 17, 1941: Carrier Group Doctrine 3 finished; begin Large Warship Radar 2.
February 22, 1941: AA guns placed in Honolulu and Sunset Beach.
February 25, 1941: RADAR training 1 finished; research continues.
February 27, 1941: Small Air Search Radar 1 finished; begin research on INT Targeting Focus 3.
March
March 5, 1941: Cruiser Crew Training 2 finished.
March 7, 1941: CV Crew Training 2 begins. ((I bumped the pause key while I was looking through my cheat sheet.
))
March 8, 1941: More RADAR stations finish; Wake has lvl 10 RADAR and Midway has lvl 8.
March 11, 1941: Desert Warfare Equipment finished; begin LARM Gun 4.
March 23, 1941: CL Escort Role 3 finished; begin Small Warship Radar 2.
March 25, 1941: Afghanistan mobilizes.
March 27, 1941: Naval Air Targeting and Port Strike Tactics 2 finished; begin Single Engine Aircraft Armament 2 and Fighter Ground Control 3.
March 31, 1941: We briefly influence Turkey.
April
April 4, 1941: Logistical Strike Tactics 3 finished; begin Bomber Targeting Focus 3.
April 11 and 13, 1941: RADAR stations finished; Midway has lvl 10 RADAR.
April 15, 1941: More RADAR stations finished, placed in Honolulu.
April 17, 1941: Naval strike tactics 3 finished; begin Medium Fuel Tank 2.
April 23, 1941: Integrated Support 2 finished; begin LARM Engine 4.
April 24, 1941: Amphibious Tactics finished; begin Mobile Warfare 1.
April 28, 1941: Cargo Hold 2 finished; research continues.
May
May 3, 1941: Armored Car Gun 1 finished; research continues. Begin construction of 24 parallel AA Brigades.
May 4, 1941: SS Hull 3 finished; begin CL Crew Training 3.
May 6, 1941: Small Fuel Tank 2 finished; research continues.
May 7, 1941: Installation Strike Tactics 3 finished; begin research on Four Engine Airframe 2.
May 9, 1941: Operational Level Organization 3 finished; begin research of Large Front 1.
May 16, 1941: Fighter Ground Crew Training 4 and Single Engine Airframe 2 finished; begin Heavy Bomber Ground Crew Training 4 and Strategic Bomber Armament 2.
May 24, 1941: AA Barrel and Ammo 1 finished; research continues.
May 30, 1941: AT Ammo and Muzzle Velocity 1 finished; research continues.
May 31, 1941: SS Engine 4 finished; begin DD Escort Role 1.
June
June 7, 1941: AA Carriage and Sights 1 and AT Barrel and Sights 1 finished; research continues.
June 9, 1941: More Radar stations for Sunset Beach.
June 25, 1941: Large Warship Radar 2 finished; begin BB Main Armament 5.
State of the Union coming soon!