As noted above base manpower is set for each provence just as base tax is. This number is then modified if the provence is not a core provence and possibley by culture and religion not being the same.Originally posted by jpd
The prod numbers I listed weren't the combined numbers, but instead the production values, as listed for each type of resource. This number can be seen by clicking on the church.
Although I like the tip you mentioned. I hadn't make the connection between province tax and # units yet.
The thing I wanted to know, however, was not what determines the #units to build in one order, but the manpower value that is also listed for each province, and which determines the total #units that are added to the construction pool each year (ie. the manpower number in the upper menu bar)
Jan Peter