162 days seems like the base amount of time not with the 50% bonus or am I mistaken?
It's taking the ahead of time reduction into account rather than the 50% off reduction. Probably a better deal but I can't check right off hand.
I thought so at first glance too, but the date is 1940, and he's looking at a 1939 tech, so there shouldn't be any ahead of time penalty, right?
Unless the base time for the tech is 324 days, then it would be reading correctly, though when I push that in 1938, believe the time is 162 days with the ahead of time bonus from the NF, making it the correct days for the tech in 1939 and beyond?