Maximize planet designation resource output.
Subject to
Base-production <= job-production
Bonus-production <= Base-production*0.2
Bonus-production <= A billion * num-bonus-building
Bonus-from-stability <= (Stability-50)*0.6
Bonus-from-stability <= (Stability-50)*1.0
Bla bla bla…
New-Buildings-count <= What-they-can-build-in-5-years.
sum( jobs) <= projected-pop-in-5-years.
Clever use of linear programming can give a rough model of what needs to be improved…
Would not be a perfect solution, but possibly better than the current AI.
Subject to
Base-production <= job-production
Bonus-production <= Base-production*0.2
Bonus-production <= A billion * num-bonus-building
Bonus-from-stability <= (Stability-50)*0.6
Bonus-from-stability <= (Stability-50)*1.0
Bla bla bla…
New-Buildings-count <= What-they-can-build-in-5-years.
sum( jobs) <= projected-pop-in-5-years.
Clever use of linear programming can give a rough model of what needs to be improved…
Would not be a perfect solution, but possibly better than the current AI.
- 1
Upvote
0