I don't have access to my game right now but I was considering the engineering and medical point mechanic....
Has anyone come out with a basic chart for it and broken it down? I am just guessing here but I would like to see if I can find or do the math if no one else has done it. In part to know the game better but also because I wonder if It could be translated into a tabletop campaign to make logistics and down time more interesting.
Leopard has:
Argo has:
Starting Medical points 6 per day but can be upgraded to 23
Starting Engineering points 6 day but can be upgraded to 12
Medical points Heals 1 mech warrior injury for 30 points?
Engineering points repair and arm at 1 point per ton. Disarm or adjust armor at tonnage/2 per point?
This could be completely wrong. I am primarily reaching out for sources right now but I will update with corrected information as I get it. I will also try and create a basic rule for doing this in table top if I can and it does not already exist.
Thank you for any help.
Edit 1: First Attempt at a Table/Calculator Let me know if you test it and find any issues. As a note if you download and have office it has buttons for resetting the charts to defaults. Thanks again.
Has anyone come out with a basic chart for it and broken it down? I am just guessing here but I would like to see if I can find or do the math if no one else has done it. In part to know the game better but also because I wonder if It could be translated into a tabletop campaign to make logistics and down time more interesting.
Leopard has:
Starting Medical points 1 per day?
Starting Engineering points 3 day?
Starting Engineering points 3 day?
Argo has:
Starting Medical points 6 per day but can be upgraded to 23
Starting Engineering points 6 day but can be upgraded to 12
Medical points Heals 1 mech warrior injury for 30 points?
Engineering points repair and arm at 1 point per ton. Disarm or adjust armor at tonnage/2 per point?
This could be completely wrong. I am primarily reaching out for sources right now but I will update with corrected information as I get it. I will also try and create a basic rule for doing this in table top if I can and it does not already exist.
Thank you for any help.
Edit 1: First Attempt at a Table/Calculator Let me know if you test it and find any issues. As a note if you download and have office it has buttons for resetting the charts to defaults. Thanks again.
Last edited: