hmm, still not "good". Im in mid 36 now (May), and at full speed, go through a day in 3 - 4 or so seconds. Sometimes there is a little "stop", which can bring a day cycle up to say 6 or so seconds.
Do you have anything set to AI control ? (for example your theaters, trade, production, etc etc ?). This im sure could be contributing to stuff going a tad slower, i run all manual (apart from autosliders --> prioritize production).
Do you have anything set to AI control ? (for example your theaters, trade, production, etc etc ?). This im sure could be contributing to stuff going a tad slower, i run all manual (apart from autosliders --> prioritize production).