Let's say I want to put all my dockyards on a production line in detriment of others, but I don't want to lose the progress on those lines deleting them. I can't find a way to assign them 0 dockyards.
Let's say I want to put all my dockyards on a production line in detriment of others, but I don't want to lose the progress on those lines deleting them. I can't find a way to assign them 0 dockyards.
- Assign only one dockyard
- Put it at the end of the queue
- Assign more dockyards that you have on the lines higher in the queue
- Repair a ship
![]()