I'm confused by the resource readout on the building status pane.
I put two metal extractors on a single deposit. Both of them say they produce 5 units of metal, but on the right they have a different "#/d" readout; one says 8/d and the other says 5/d.
If they both produce 5 units of metal, why do they produce at different rates? Is it because neither one is completely covering the deposit? Would a single metal extractor centered perfectly on the deposit produce the fastest?
I put two metal extractors on a single deposit. Both of them say they produce 5 units of metal, but on the right they have a different "#/d" readout; one says 8/d and the other says 5/d.
If they both produce 5 units of metal, why do they produce at different rates? Is it because neither one is completely covering the deposit? Would a single metal extractor centered perfectly on the deposit produce the fastest?