I'm getting a tooltip in the production screen saying that production is halted due to lack of manpower, but also that it is going at full speed; there is plenty of manpower to spare, and has been since before the production was initiated.
The tooltip oddity only appeared when I manually extended the original run, which was on its last division in the series. It appears to just be a cosmetic problem, completion dates do not change so production seems to be running as it should.
DH Full 1.01 beta 1.

The tooltip oddity only appeared when I manually extended the original run, which was on its last division in the series. It appears to just be a cosmetic problem, completion dates do not change so production seems to be running as it should.
DH Full 1.01 beta 1.
Upvote
0